Kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
Main Head: Bridgework.
Sub. Head: Minor Work
Bridge No.40.
Item DESCRIPTION Quantity Unit Rate AMOUNT Two 5 ft. arches at pag 90*750. Excavation in foundations. 5,950 C.Y. 10/- 2,975 00 Pumping and timering. 3,160 40/- 6,320 00 Concrete in foundations. 3,470 69 2,394 30 Masonry in superstructure. 760 80 608 00 Masonry in arches. 110 1,300 1,430 00 Masonry in spandrel. 2,680 80 2,144 00 Dry stone backing & flooring. 24 220 00 Total 4,756 00 Contingencies 10% 475 30 Grand Total 5,231 30C.R.E. No. 24.
111
yslis notns noolwod
31: 9
MOITO32 HAITISA
.3TAMI723
E
*t a
km C.R.E. No. 24.
kowloon Canton Railway.
111
BRITISH SECTION
ESTIMATE.
bash nint!
best du
Main Head
Sub. Head
Briɑgework.
Kinor.
Bridge No.40.
N
Work
Two 5 ft. arohes at pag 90*750.
.................
Quantity.
DESCRIPTION.
Ja sa a VI
5,950 Zxcartiua în foundations.
Item
Pumping and timering.
3,160 || Concrete in foundations.
$,470 | #asonry in superstructure.
760
Masonry in arches,
110 | Wasonry in soyânge
2;680 | Dry stone backing & flooring.
AMOUNT,
Rate. Unit.
$
Cis.
10/
40/-
点
K K
69 50
800
00
8 8 8 8 8
1,106 00
1,300 00
1,520 00
220
8
10 %0
24 30
IsoT
Of estoniquinoƆ
jaol burD
Total
Contingincies 10%
Grand Total
4,756
00
473 30
$,211 30